USDA – Forest Service:
Oconaluftee Job Corps Center Roof Replacement / Interior Build Out
About this Project
AACON provided construction management services for this contract. Our PM managed project controls, communicated with Government and other stakeholders, and managed procurements. The original roof systems were flat, ballasted rock-finished, EPDM membrane, each totaling 4,300 SF. We demolished and removed the existing structure including water damaged and deteriorating trusses, sheathing, rigid insulation, ventilated soffits, and sheet metal trim edges. Damaged interior ceiling panels were removed, and salvaged panels stored for reinstallation. The rooftop HVAC units and ductwork were carefully disassembled, cleaned with biocides, sealed, and covered to maintain integrity for reinstallation. A new EPDM 60-mil vinyl roof was installed over the new trusses, roof sheathing.
This project was completed 15 days ahead of schedule, despite the additional scope and challenges encountered. The team received excellent ratings across all areas for this contract maintaining project transparency and visibility throughout the contract.
Project Cost at Award: $979,794
Set Aside: 8(a) Sole Source