US Army Corps of Engineers, Louisville District, SDVOSB Multiple Award Task Order Contract (MATOC): Renovate Operations Group Facility Building 668
About this Project
This project was a full restoration, both interior and exterior, of the Operations Group Facility. The SOW included asbestos abatement, complete demolition of the existing interior infrastructure, installation of a new wet-pipe sprinkler system, fire alarm/mass notification system, telecommunications system, and interior mechanical, electrical, and plumbing infrastructure. Interior finishes to the building were executed simultaneously to the exterior work on the building: an EPDM roof system was removed and replaced, a new front entrance Portico was added, and the surrounding landscape was restored.
Acceptance of the facility occurred on October 16, 2020, sixty-one (61) calendar days ahead of the required contract completion date. The Renovate Operations Group Facility project was the third project that AACON has completed at this installation. Due to the success of this project, AACON was awarded two additional negotiated contracts at GARB.
Project Value: $ 4,062,193.00
Set Aside: SDVOSB, MATOC – Competitive